Coal Handling Plant – Wagon Tippler Automation
Service & AMC Support | Power Plant Coal Handling System
This project involves service support and Annual Maintenance Contract (AMC)
for the Wagon Tippler system of a Coal Handling Plant (CHP),
a critical facility supporting continuous fuel supply to a
500 MW thermal power plant.
The automation system ensures safe, reliable, and uninterrupted unloading
of coal wagons under demanding operational conditions.
The Wagon Tippler automation plays a vital role in coordinating wagon positioning,
tippling sequences, interlocks, and safety mechanisms.
High system availability is essential to prevent fuel shortages and maintain
stable power generation operations.
The control architecture is based on a Siemens PLC-based automation system,
designed to deliver high reliability and continuous operation
in demanding power plant environments.
Execution Scope
- Service support for Coal Handling Plant Wagon Tippler system
- Annual Maintenance Contract (AMC) execution
- PLC system maintenance and troubleshooting
- System health checks and performance optimization
- On-site technical support to ensure continuous plant availability
Technology Used
Automation Platform: Siemens PLC
Application: Coal Handling Plant – Wagon Tippler
Key Benefits
- High system availability for uninterrupted coal unloading
- Improved operational safety and interlocking reliability
- Reduced downtime through proactive AMC support
- Reliable automation for mission-critical power plant operation
Our Happy Customer
500 MW Power Plant – CHP-II
Khaparkheda, Maharashtra